₹80
Add to cart
779 left

TREE HOUSE IN LUMION RENDER SETTINGS

₹80
3 ratings

Put 0 in the PRICE BOX & Checkout.

Forest 3D Render LUMION SETTINGS, in Lumion.10.3

Contents of the downloadable file:

1. One Lumion 10.3.2 File (.ls10) with Preset with 1 effect

__________

Follow us on Youtubehttps://www.youtube.com/channel/UCaGRHUrA9ct6QdeKRd6hwjA

Subscribe us on YouTube to learn free of cost with 100 tutorials.

Why Do You Need This Scene?

To get full insights of how the scene was made and understand how to achieve similar results in your projects.

Instructions:

To use the scene, you need to open the Lumion file (double-click on the scene file or load it through Lumion 10 Pro).

Specs:

This file was created in Lumion 10 Pro and is fully compatible only with this version of Lumion and above. The effects, camera angles, and materials in the scene can be edited.

© 2021 RENDERING ARTISTS. All Rights Reserved. https://renderingartists.com/

Add to cart
221 sales

TREE HOUSE 3D Render LUMION SETTINGS `

Size
1.35 MB

Ratings

5
(3 ratings)
5 stars
100%
4 stars
0%
3 stars
0%
2 stars
0%
1 star
0%
Powered by